Skip to content
2 × 22 kW · dual port

Commercial EV Chargers — Dual-Port AC Pedestals

Floor-standing posts that charge two cars from one foundation — with screens, RFID and optional bank-card payment for car parks open to the public.

MOLZEX Commercial AC Series dual-port charging pedestals at a hotel at golden hour
1 series

Choose a series

Selection guide

Planning AC charging for a car park

  1. 01

    Count the hours, not the cars

    Guests and staff park for hours — 7–11 kW per bay is usually enough.

  2. 02

    Two bays per post

    Dual-port pedestals halve the number of foundations and cable runs.

  3. 03

    Share the supply

    Group load management lets many posts run on a supply smaller than the sum of their ratings.

  4. 04

    Decide how drivers pay

    RFID for staff, a card terminal for visitors, OCPP for billing either way.

Questions about commercial ac

How many posts can share one supply?

With group load management, power is shared across posts so the site never exceeds the set limit.

Tell us about your charging project

Share the market, charger type and quantities — our engineers will recommend a configuration and send a quotation.

Ready to power your next charging project?

Talk to a MOLZEX engineer about models, OEM branding and lead times.

Request a Quote
Request a Quote